Skip to content
All posts
Industry·7 min

Public procurement: what can an AI agent prepare for a public buyer?

Consultation documents, completeness of applications, bid analysis table, bidders’ questions: what an AI agent prepares for a public procurement department, and what stays with the buyer.

by Abderrahime El Idrissi · President, co-founder
Contents

It prepares the consultation documents from your templates, checks that the applications received are complete, builds the bid analysis table against the published criteria and drafts the answers to bidders’ questions. The buyer keeps the scoring, the choice and the signature, and every step can be read back on the day of the review.

What going paperless did not lighten

Tuesday, 4:40 pm, in the procurement department of an urban community. The consultation for green space maintenance closes in nine days. Three bidders’ questions have arrived on the buyer profile since the morning, one of them about a zone map that the technical specifications mention without attaching it. The buyer has to answer and publish the answer for everyone. At the same time she is preparing next week’s committee, which will examine the bids for another contract: twelve applications, each with a dozen documents to check.

Going paperless removed the paper, not the work. Bids arrive on the platform, but someone still has to check that each bidder provided what the consultation rules require, read the bids one by one and enter in a table what each one offers for each criterion. The public procurement census counted 223,383 contracts worth 233 billion euros in 2024. It now covers contracts from 40,000 euros excluding VAT, against 90,000 before. Behind each one, a file reviewed document by document.

Drafting from your templates

A purchasing department reuses a lot. The consultation rules for a works contract look like the previous ones, the special administrative clauses refer to the same general clauses, the specifications for building maintenance take up those of four years ago. The agent starts from the templates the department has approved and from the documents of the last comparable consultation, found in the document management system. It prepares a first draft and flags what must change: a date, an added lot, a price revision clause to update, a reference to a text amended since.

It sets neither the division into lots, nor the criteria, nor their weighting. These choices commit the buyer and have to be defended before a rejected bidder. The agent takes them as the buyer decided them and carries them over identically into every document, which avoids rules announcing three criteria when the notice publishes two.

Checking that applications are complete

When the bids are opened, the agent lists for each bidder what the consultation rules require and what was submitted: application letter, bidder’s declaration, certificates, references, capacities, signatory’s authority. It spots the missing document, the certificate past its date, the file submitted under the wrong name, and it shows the page concerned.

The French public procurement code allows the buyer to ask the bidders concerned to complete their file, within an appropriate time limit that is the same for all (article R2144-2). The agent prepares the list of requests, bidder by bidder, and the letters that go with them. The buyer decides to send them, and it is the buyer who, where needed, rejects an application that remains incomplete.

Preparing the bid analysis

This is the longest part, and the one where a mistake costs the most: a score carried over wrongly, a forgotten sub-criterion, and the analysis report no longer holds up against an appeal. The agent reads the bids and fills in, criterion by criterion, the table the consultation rules set. For technical merit, lead times and price, it records what each bidder offers, with, for each line, the passage of the technical proposal or the price schedule it comes from.

It also flags what does not fit: a price that looks very low compared with the other bids, a variant the rules do not allow, a lead time that contradicts the attached schedule, two lines of the price schedule whose total does not add up. It does not score. The score, the review of a bid that might be abnormally low and the ranking belong to the buyer and, depending on the case, to the committee. The agent hands them a table where every cell points to its source.

Answering bidders during the consultation

Questions often arrive in the last few days. In a formal procedure, additional information requested in good time must be sent no later than six days before the deadline for bids (article R2132-6), and equal treatment means that the answer given to one bidder is known to all. The agent prepares each answer from the consultation documents, citing the article of the specifications or the rules that answers it. It sets aside the question the documents do not answer: that one calls for a decision, sometimes a change to the documents and a later deadline. The buyer reviews, adjusts and publishes on the buyer profile.

For the question about the zone map, the agent would have noted that the specifications mention it in article 3.2 although it is not among the documents, and proposed to add it, with an answer ready to publish. It is still up to the buyer to judge whether this justifies moving the bid deadline.

What stays with the buyer

The choice of procedure, the division into lots, the criteria, the scoring, the ranking, the award, the signature, the letters to rejected bidders and the procedure report: everything that commits the public body stays with those accountable for it. The agent prepares documents and tables. The department sets what it may do on its own: a team can let it chase a bidder for a missing document once the request is approved, and keep control of every answer published.

In November 2025, at the plenary meeting of the Public Procurement Economic Observatory, Clémence Olsina, director of legal affairs at the French economy and finance ministries, summed up the latest census in one sentence: “The progress in public procurement figures shows that we are making progress.” (original in French: « La progression des chiffres de la commande publique montre que nous progressons. ») Reliable figures start with well-kept files, contract by contract.

Hosting, traceability and review

A consultation must be readable after the fact: by the prefecture’s legality review, by a judge hearing an urgent appeal, by a rejected bidder asking for the reasons. Every action of the agent lives in a Cases file: the documents read, what it proposed, who approved and when. The documents stay in the document management system and on the buyer profile; the agent reads them with the rights it has been given, without copying them elsewhere.

Scalt is hosted in a cloud in France and can also be installed on your premises, on your servers or in your cloud. Data is never used to train models. In a local authority, these are often the first two questions asked, before uses even come up.

Frequently asked questions

What about residents’ questions?

Same principle, at another desk: the agent drafts answers from the authority’s public information sheets, citing its source, and a staff member reviews them. The public sector page follows a building permit request in this way, from the front desk to the management note.

And on the side of the companies that bid?

The article on construction tenders tells the same market from the bidding company’s side: reading the consultation documents, questions to ask, technical proposal.

Does the agent connect to our buyer profile?

It connects to your tools through their interfaces or through exports, depending on what they allow; this is reviewed during scoping. When a tool allows neither, the documents saved in the document management system cover most of the work.

See Scalt on your own cases

30 minutes with a team member: your needs, your tools, your confidentiality requirements.

Book a demo

Sources

  1. Acteurs Publics, public procurement census for 2024 by the Public Procurement Economic Observatory, Philippine Ramognino, 26 November 2025, in French (page opened on 2026-11-13)
  2. French public procurement code, article R2144-2, in force since 1 April 2019, Légifrance, in French (page opened on 2026-11-13)
  3. French public procurement code, article R2132-6, in force since 1 April 2019, Légifrance, in French (page opened on 2026-11-13)
Go furtherScalt for the public sector: front desk, case review, legal, management
Author
Abderrahime El Idrissi
President, co-founder
Their entry on the About page
See Scalt on your own cases

30 minutes with a team member: your needs, your tools, your confidentiality requirements.

Book a demo
Newsletter

Behind the scenes of Scalt, once a month.

Once a month. One-click unsubscribe.